aboutsummaryrefslogtreecommitdiff
path: root/gcc/testsuite/ada/acats/tests/c9/c951002.a
diff options
context:
space:
mode:
Diffstat (limited to 'gcc/testsuite/ada/acats/tests/c9/c951002.a')
-rw-r--r--gcc/testsuite/ada/acats/tests/c9/c951002.a334
1 files changed, 0 insertions, 334 deletions
diff --git a/gcc/testsuite/ada/acats/tests/c9/c951002.a b/gcc/testsuite/ada/acats/tests/c9/c951002.a
deleted file mode 100644
index 8ccb2d012fe..00000000000
--- a/gcc/testsuite/ada/acats/tests/c9/c951002.a
+++ /dev/null
@@ -1,334 +0,0 @@
--- C951002.A
---
--- Grant of Unlimited Rights
---
--- Under contracts F33600-87-D-0337, F33600-84-D-0280, MDA903-79-C-0687,
--- F08630-91-C-0015, and DCA100-97-D-0025, the U.S. Government obtained
--- unlimited rights in the software and documentation contained herein.
--- Unlimited rights are defined in DFAR 252.227-7013(a)(19). By making
--- this public release, the Government intends to confer upon all
--- recipients unlimited rights equal to those held by the Government.
--- These rights include rights to use, duplicate, release or disclose the
--- released technical data and computer software in whole or in part, in
--- any manner and for any purpose whatsoever, and to have or permit others
--- to do so.
---
--- DISCLAIMER
---
--- ALL MATERIALS OR INFORMATION HEREIN RELEASED, MADE AVAILABLE OR
--- DISCLOSED ARE AS IS. THE GOVERNMENT MAKES NO EXPRESS OR IMPLIED
--- WARRANTY AS TO ANY MATTER WHATSOEVER, INCLUDING THE CONDITIONS OF THE
--- SOFTWARE, DOCUMENTATION OR OTHER INFORMATION RELEASED, MADE AVAILABLE
--- OR DISCLOSED, OR THE OWNERSHIP, MERCHANTABILITY, OR FITNESS FOR A
--- PARTICULAR PURPOSE OF SAID MATERIAL.
---*
---
--- OBJECTIVE:
--- Check that an entry and a procedure within the same protected object
--- will not be executed simultaneously.
---
--- TEST DESCRIPTION:
--- Two tasks are used. The first calls an entry who's barrier is set
--- and is thus queued. The second calls a procedure in the same
--- protected object. This procedure clears the entry barrier of the
--- first then executes a lengthy compute bound procedure. This is
--- intended to allow a multiprocessor, or a time-slicing implementation
--- of a uniprocessor, to (erroneously) permit the first task to continue
--- while the second is still computing. Flags in each process in the
--- PO are checked to ensure that they do not run out of sequence or in
--- parallel.
--- In the second part of the test another entry and procedure are used
--- but in this case the procedure is started first. A different task
--- calls the entry AFTER the procedure has started. If the entry
--- completes before the procedure the test fails.
---
--- This test will not be effective on a uniprocessor without time-slicing
--- It is designed to increase the chances of failure on a multiprocessor,
--- or a uniprocessor with time-slicing, if the entry and procedure in a
--- Protected Object are not forced to acquire a single execution
--- resource. It is not guaranteed to fail.
---
---
--- CHANGE HISTORY:
--- 06 Dec 94 SAIC ACVC 2.0
---
---!
-
-with Report;
-with ImpDef;
-
-procedure C951002 is
-
- -- These global error flags are used for failure conditions within
- -- the protected object. We cannot call Report.Failed (thus Text_io)
- -- which would result in a bounded error.
- --
- TC_Error_01 : Boolean := false;
- TC_Error_02 : Boolean := false;
- TC_Error_03 : Boolean := false;
- TC_Error_04 : Boolean := false;
- TC_Error_05 : Boolean := false;
- TC_Error_06 : Boolean := false;
-
-begin
-
- Report.Test ("C951002", "Check that a procedure and an entry body " &
- "in a protected object will not run concurrently");
-
- declare -- encapsulate the test
-
- task Credit_Message is
- entry TC_Start;
- end Credit_Message;
-
- task Credit_Task is
- entry TC_Start;
- end Credit_Task;
-
- task Debit_Message is
- entry TC_Start;
- end Debit_Message;
-
- task Debit_Task is
- entry TC_Start;
- end Debit_Task;
-
- --====================================
-
- protected Hold is
-
- entry Wait_for_CR_Underload;
- procedure Clear_CR_Overload;
- entry Wait_for_DB_Underload;
- procedure Set_DB_Overload;
- procedure Clear_DB_Overload;
- --
- function TC_Message_is_Queued return Boolean;
-
- private
- Credit_Overloaded : Boolean := true; -- Test starts in overload
- Debit_Overloaded : Boolean := false;
- --
- TC_CR_Proc_Finished : Boolean := false;
- TC_CR_Entry_Finished : Boolean := false;
- TC_DB_Proc_Finished : Boolean := false;
- TC_DB_Entry_Finished : Boolean := false;
- end Hold;
- --====================
- protected body Hold is
-
- entry Wait_for_CR_Underload when not Credit_Overloaded is
- begin
- -- The barrier must only be re-evaluated at the end of the
- -- of the execution of the procedure, also while the procedure
- -- is executing this entry body must not be executed
- if not TC_CR_Proc_Finished then
- TC_Error_01 := true; -- Set error indicator
- end if;
- TC_CR_Entry_Finished := true;
- end Wait_for_CR_Underload ;
-
- -- This is the procedure which should NOT be able to run in
- -- parallel with the entry body
- --
- procedure Clear_CR_Overload is
- begin
-
- -- The entry body must not be executed until this procedure
- -- is completed.
- if TC_CR_Entry_Finished then
- TC_Error_02 := true; -- Set error indicator
- end if;
- Credit_Overloaded := false; -- clear the entry barrier
-
- -- Execute an implementation defined compute bound routine which
- -- is designed to run long enough to allow a task switch on a
- -- time-sliced uniprocessor, or for a multiprocessor to pick up
- -- another task.
- --
- ImpDef.Exceed_Time_Slice;
-
- -- Again, the entry body must not be executed until the current
- -- procedure is completed.
- --
- if TC_CR_Entry_Finished then
- TC_Error_03 := true; -- Set error indicator
- end if;
- TC_CR_Proc_Finished := true;
-
- end Clear_CR_Overload;
-
- --============
- -- The following subprogram and entry body are used in the second
- -- part of the test
-
- entry Wait_for_DB_Underload when not Debit_Overloaded is
- begin
- -- By the time the task that calls this entry is allowed access to
- -- the queue the barrier, which starts off as open, will be closed
- -- by the Set_DB_Overload procedure. It is only reopened
- -- at the end of the test
- if not TC_DB_Proc_Finished then
- TC_Error_04 := true; -- Set error indicator
- end if;
- TC_DB_Entry_Finished := true;
- end Wait_for_DB_Underload ;
-
-
- procedure Set_DB_Overload is
- begin
- -- The task timing is such that this procedure should be started
- -- before the entry is called. Thus the entry should be blocked
- -- until the end of this procedure which then sets the barrier
- --
- if TC_DB_Entry_Finished then
- TC_Error_05 := true; -- Set error indicator
- end if;
-
- -- Execute an implementation defined compute bound routine which
- -- is designed to run long enough to allow a task switch on a
- -- time-sliced uniprocessor, or for a multiprocessor to pick up
- -- another task
- --
- ImpDef.Exceed_Time_Slice;
-
- Debit_Overloaded := true; -- set the entry barrier
-
- if TC_DB_Entry_Finished then
- TC_Error_06 := true; -- Set error indicator
- end if;
- TC_DB_Proc_Finished := true;
-
- end Set_DB_Overload;
-
- procedure Clear_DB_Overload is
- begin
- Debit_Overloaded := false; -- open the entry barrier
- end Clear_DB_Overload;
-
- function TC_Message_is_Queued return Boolean is
- begin
-
- -- returns true when one message arrives on the queue
- return (Wait_for_CR_Underload'Count = 1);
-
- end TC_Message_is_Queued ;
-
- end Hold;
-
- --====================================
-
- task body Credit_Message is
- begin
- accept TC_Start;
- --:: some application processing. Part of the process finds that
- -- the Overload threshold has been exceeded for the Credit
- -- application. This message task queues itself on a queue
- -- waiting till the overload in no longer in effect
- Hold.Wait_for_CR_Underload;
- exception
- when others =>
- Report.Failed ("Unexpected Exception in Credit_Message Task");
- end Credit_Message;
-
- task body Credit_Task is
- begin
- accept TC_Start;
- -- Application code here (not shown) determines that the
- -- underload threshold has been reached
- Hold.Clear_CR_Overload;
- exception
- when others =>
- Report.Failed ("Unexpected Exception in Credit_Task");
- end Credit_Task;
-
- --==============
-
- -- The following two tasks are used in the second part of the test
-
- task body Debit_Message is
- begin
- accept TC_Start;
- --:: some application processing. Part of the process finds that
- -- the Overload threshold has been exceeded for the Debit
- -- application. This message task queues itself on a queue
- -- waiting till the overload is no longer in effect
- --
- Hold.Wait_for_DB_Underload;
- exception
- when others =>
- Report.Failed ("Unexpected Exception in Debit_Message Task");
- end Debit_Message;
-
- task body Debit_Task is
- begin
- accept TC_Start;
- -- Application code here (not shown) determines that the
- -- underload threshold has been reached
- Hold.Set_DB_Overload;
- exception
- when others =>
- Report.Failed ("Unexpected Exception in Debit_Task");
- end Debit_Task;
-
- begin -- declare
-
- Credit_Message.TC_Start;
-
- -- Wait until the message is queued on the entry before starting
- -- the Credit_Task
- while not Hold.TC_Message_is_Queued loop
- delay ImpDef.Minimum_Task_Switch;
- end loop;
- --
- Credit_Task.TC_Start;
-
- -- Ensure the first part of the test is complete before continuing
- while not (Credit_Message'terminated and Credit_Task'terminated) loop
- delay ImpDef.Minimum_Task_Switch;
- end loop;
-
- --======================================================
- -- Second part of the test
-
-
- Debit_Task.TC_Start;
-
- -- Delay long enough to allow a task switch to the Debit_Task and
- -- for it to reach the accept statement and call Hold.Set_DB_Overload
- -- before starting Debit_Message
- --
- delay ImpDef.Switch_To_New_Task;
-
- Debit_Message.TC_Start;
-
- while not Debit_Task'terminated loop
- delay ImpDef.Minimum_Task_Switch;
- end loop;
-
- Hold.Clear_DB_Overload; -- Allow completion
-
- end; -- declare (encapsulation)
-
- if TC_Error_01 then
- Report.Failed ("Wait_for_CR_Underload executed out of sequence");
- end if;
- if TC_Error_02 then
- Report.Failed ("Credit: Entry executed before procedure");
- end if;
- if TC_Error_03 then
- Report.Failed ("Credit: Entry executed in parallel");
- end if;
- if TC_Error_04 then
- Report.Failed ("Wait_for_DB_Underload executed out of sequence");
- end if;
- if TC_Error_05 then
- Report.Failed ("Debit: Entry executed before procedure");
- end if;
- if TC_Error_06 then
- Report.Failed ("Debit: Entry executed in parallel");
- end if;
-
- Report.Result;
-
-end C951002;